CCR was contracted to pre-assemble, transport (to Victoria), fully
erect and commission the Mine Screening Plant. Pre-assembly was conducted in Perth at the client’s yard, and then transported to Victoria for final assembly and commissioning.
A project ready team traveled to Victoria to installed and commission the plant. The plant was installed safely, on time and on budget.